Rokia Delmas

10/24/2006
France

The incident

On 24 October 2006, the container ship Rokia Delmas (600 tonnes of heavy fuel oil, 300 containers of cocoa beans) ran aground on Ré island (Charente-Maritime) after an engine failure during a storm. Althoughno major pollution was noted, a 20 m-long breach in the hull made towing impossible.

Spill response and crisis management

  • Formal notice to the charterer on 24 October 2006
  • Polmar Land Plan activated in Charente-Maritime
  • 1st investigations noted a breach which made it impossible to refloat the vessel. The decision was taken to cut the wreck on site.
  • The land prefecture decided to set up booms to protect the oyster farms.
  • Pumping: From the oil floating in the hull of the vessel, 430 m³ of fuel was recovered (mostly between 27 October and 3 November)
  • A drift committee was placed on pre-alert in La Rochelle
  • Risk assessment regarding cargo: experimentations on cocoa beans (risk of floatability and release of hydrogen sulfide in an anaerobic environment)

Treatment and lightering of the wreck

  • Phase 1: Unloading and removal of the containers (ended in September).
  • Phase 2: Transverse cutting of the hull into 5 sections.
  • Phase 3: Towing of the different sections towards the port of La Rochelle and treatment of residual debris (ended on 18 December).
  • Suppression of the formal notice to the charterer and end of the maritime work for the removal of the Rokia Delmas on 19 December
  • Treatment continued on land

Conclusions and Developments

  • The feedback process, initiated by the Maritime prefect for the Atlantic and involving all stakeholders provided various information :
    • The need for a precise definition of responsibilities for the various stakeholders, namely regarding the land-sea interface management.
    • The difficulty or impossibility to protect exposed sensitive areas highlighted the need for a defined boom use policy, accompanied by a clear definition of the role of ports in this kind of situations.
  • Experiments on the cargo and analyses of the propulsion fuel were necessary to understand the behaviour of these elements and assess the risks they posed.
  • Cost and duration: 14 months of operations, complex cutting operations in a coastal tourist area.
  • To find out more: Read about similar cases (ex.: Fénès, Tricolor, Melbridge Bilbao)
Shipwreck zoneSouth of the Ile de Ré, Atlantic coast
Spill areaCoastal zone
Accident causeGrounding
Quantity transported600 tonnes of heavy fuel oil (IFO 380) and 50 tonnes of marine diesel
Vessel typeContainer ship (1,446 TEU)
Construction year1985
Length185 m
Width32.6 m
FlagPanama
OwnerCMA-CGM (France)