Fast current systems
Fast current systems are specially designed to respond to spills (particulary of oil or floating materials) in areas of strong current and powerful waves (current > 0.7 knots). Such systems are suited to harsh environments where recovery is more complex. They can be used in combination with skimmers
Standardised tests
Aims
Assess the mechanical properties of fast current systems (tensile strength)
Location
CEDRE:
- Technical facilities
CEDRE's partners
Duration
Approximately 1 to 2 days
Standards
Protocol based on standards:
- NF EN ISO 1421
- ASTM F1093
Custom tests
Aims
Assess and compare booms using test benches and protocols specifically designed to meet the client's needs
Assessment of the chemical compatibility of fabrics
Location
CEDRE:
- Laboratory
Natural environment
Industrial and port site
Products
- Oil
- Chemicals
Duration
Approximately 1 to 3 days
Standards
Custom protocol designed according to client's needs
Deployment tests
Aims
Assess deployment feasibility and operational conditions, as well as the ability to protect areas if strong current by evaluating the system's capacity to contain a floating pollutant (simulant)
Use of different deployment systems (boom vane, vessels, etc.) to define optimum conditions of use
Location
Natural environment
Industrial and port site
Products
Simulant
Duration
Approximately 1 to 2 days
Standards
Deployment based on client's needs