Fast current systems

Fast current systems

Fast current systems are specially designed to respond to spills (particulary of oil or floating materials) in areas of strong current and powerful waves (current > 0.7 knots). Such systems are suited to harsh environments where recovery is more complex. They can be used in combination with skimmers

Standardised tests

Aims

Assess the mechanical properties of fast current systems (tensile strength)

Location

CEDRE:

  • Technical facilities 

CEDRE's partners

Duration

Approximately 1 to 2 days

Standards

Protocol based on standards:

  • NF EN ISO 1421
  • ASTM F1093

Custom tests

Aims

Assess and compare booms using test benches and protocols specifically designed to meet the client's needs

Assessment of the chemical compatibility of fabrics

Location

CEDRE:

  • Laboratory

Natural environment

Industrial and port site

Products

  • Oil
  • Chemicals

Duration

Approximately 1 to 3 days

Standards

Custom protocol designed according to client's needs

Deployment tests

Aims

Assess deployment feasibility and operational conditions, as well as the ability to protect areas if strong current by evaluating the system's capacity to contain a floating pollutant (simulant)

Use of different deployment systems (boom vane, vessels, etc.) to define optimum conditions of use

Location

Natural environment

Industrial and port site

Products

Simulant

Duration

Approximately 1 to 2 days

Standards

Deployment based on client's needs

Newsletter

Every month, get our latest news, projects and field actions delivered to your inbox.

Your email address remains confidential. You can unsubscribe at any time.